IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0481 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,839 $1,000 Implemented
SD0481 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $22,759 $25,200 Not Implemented
SD0481 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,116 $2,600 Implemented
SD0481 # 06 Y:2014 06 2014 MAINTAIN MACHINES TO REDUCE LEAKS $14,877 $5,000 Implemented
SD0481 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,167 $16,320 Implemented
SD0481 # 08 Y:2014 08 2014 REPAIR AND ELIMINATE STEAM LEAKS $2,220 $1,200 Implemented
SD0481 # 09 Y:2014 09 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,553 $2,325 Implemented
SF0445 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,564 $0 Implemented
SF0445 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,245 $0 Implemented
SF0445 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,086 $16,174 Not Implemented
SF0445 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,993 $21,342 Implemented
SF0445 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,822 $90,352 Not Implemented
SF0444 # 01 Y:2014 01 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $9,479 $8,763 Not Implemented
SF0444 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,108 $4,124 Not Implemented
SF0444 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $22,758 Not Implemented
SF0444 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $1,967 Implemented
SF0444 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,642 $40,100 Not Implemented
SD0480 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $102,356 $456,500 Not Implemented
SD0480 # 02 Y:2014 02 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $58,476 $249,000 Not Implemented
SD0480 # 03 Y:2014 03 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,051 $52,333 Not Implemented
SD0480 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,662 $300 Implemented
SD0480 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,971 $5,075 Not Implemented
SD0480 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,686 $4,500 Not Implemented
SD0480 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,176 $3,050 Not Implemented
SD0480 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $634 $370 Not Implemented