IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0335 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $5,433 Implemented
MA0335 # 09 Y:1995 09 1995 COMBINE UTILITY METERS $300 $0 Implemented
MA0335 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $318 $0 Implemented
MA0335 # 04 Y:1995 04 1995 OPERATE BOILERS ON HIGH FIRE SETTING $662 $400 Implemented
MA0335 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,352 $1,790 Implemented
MA0308 # 02 Y:1994 02 1994 REPAIR OR REPLACE STEAM TRAPS $19,471 $813 Implemented
MA0308 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $87,650 $18,145 Implemented
MA0308 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $441 $110 Implemented
MA0284 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $158 $0 Implemented
MA0284 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $689 $685 Implemented
MA0245 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $2,833 $5,040 Implemented
MA0245 # 02 Y:1992 02 1992 REDESIGN PROCESS $4,412 $1,554 Implemented
MA0246 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,358 $2,672 Implemented
MA0245 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,237 $0 Implemented
MA0246 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $443 $386 Implemented
MA0246 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $100 $85 Implemented
MA0246 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $526 $0 Implemented
MA0238 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,814 $2,053 Implemented
MA0238 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $2,305 $0 Implemented
MA0238 # 08 Y:1992 08 1992 MODERATE COOLING TOWER OUTLET TEMPERATURE $181 $100 Implemented
MA0228 # 02 Y:1991 02 1991 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $8,647 $5,000 Implemented
MA0228 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $2,000 Implemented
MA0228 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $400 Implemented
MA0228 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $458 $430 Implemented
MA0197 # 05 Y:1990 05 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $972 $0 Implemented