Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
170
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0591 # 03 Y:2006 | 03 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $26,565 | $37,830 | Implemented |
MA0591 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $2,354 | $5,390 | Implemented |
MA0591 # 08 Y:2006 | 08 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,780 | $5,264 | Implemented |
MA0588 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $3,404 | $2,197 | Implemented |
MA0588 # 02 Y:2005 | 02 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $2,294 | $500 | Implemented |
MA0588 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,132 | $4,668 | Implemented |
MA0586 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,081 | $140 | Implemented |
MA0586 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,200 | $0 | Implemented |
MA0586 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $841 | $1,646 | Implemented |
MA0586 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $443 | $1,395 | Implemented |
MA0586 # 05 Y:2005 | 05 | 2005 | COMBINE UTILITY METERS | $1,736 | $1,950 | Implemented |
MA0560 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $317 | $256 | Implemented |
MA0560 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,752 | $238,150 | Implemented |
MA0560 # 02 Y:2004 | 02 | 2004 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $32,756 | $23,710 | Implemented |
MA0560 # 05 Y:2004 | 05 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $230 | $175 | Implemented |
MA0560 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,875 | $1,200 | Implemented |
MA0558 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $12,830 | $5,000 | Implemented |
MA0558 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $28,200 | $4,500 | Implemented |
MA0558 # 06 Y:2004 | 06 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,912 | $0 | Implemented |
MA0558 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,494 | $4,680 | Implemented |
MA0558 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,965 | $2,690 | Implemented |
MA0551 # 07 Y:2004 | 07 | 2004 | $2,179 | $0 | Implemented | |
MA0551 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $958 | $1,020 | Implemented |
MA0551 # 01 Y:2004 | 01 | 2004 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $36,008 | $0 | Implemented |
MA0551 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,302 | $4,680 | Implemented |