Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0626 # 06 Y:2007 | 06 | 2007 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $395 | $200 | Not Implemented |
MA0626 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,602 | $5,481 | Not Implemented |
MA0626 # 04 Y:2007 | 04 | 2007 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $3,465 | $2,500 | Not Implemented |
MA0626 # 03 Y:2007 | 03 | 2007 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $5,346 | $0 | Not Implemented |
MA0626 # 02 Y:2007 | 02 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,543 | $8,000 | Not Implemented |
MA0626 # 01 Y:2007 | 01 | 2007 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $67,278 | $157,500 | Not Implemented |
MA0623 # 03 Y:2007 | 03 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,297 | $1,184 | Implemented |
MA0623 # 01 Y:2007 | 01 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,848 | $117,000 | Not Implemented |
MA0623 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,363 | $50,282 | Not Implemented |
MA0623 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $643 | $460 | Implemented |
MA0621 # 05 Y:2007 | 05 | 2007 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $405 | $280 | Implemented |
MA0621 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $646 | $2,000 | Not Implemented |
MA0621 # 03 Y:2007 | 03 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,253 | $10,000 | Implemented |
MA0621 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,424 | $29,000 | Not Implemented |
MA0621 # 01 Y:2007 | 01 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $61,876 | $354,790 | Not Implemented |
MA0617 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,429 | $6,500 | Not Implemented |
MA0617 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,016 | $0 | Implemented |
MA0617 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,068 | $24,034 | Implemented |
MA0617 # 01 Y:2007 | 01 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,579 | $2,348 | Implemented |
MA0613 # 05 Y:2007 | 05 | 2007 | INSULATE BARE EQUIPMENT | $507 | $256 | Implemented |
MA0613 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $20,408 | $15,900 | Not Implemented |
MA0613 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,574 | $53,250 | Implemented |
MA0613 # 02 Y:2007 | 02 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,346 | $54,617 | Implemented |
MA0613 # 01 Y:2007 | 01 | 2007 | REDUCE VENTILATION AIR | $22,488 | $15,475 | Implemented |
MA0609 # 02 Y:2007 | 02 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $11,356 | $40,000 | Not Implemented |