IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0053 # 13 Y:2010 13 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,600 $100 Implemented
DL0053 # 14 Y:2010 14 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $18,000 $8,600 Implemented
DL0053 # 15 Y:2010 15 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,000 $31,440 Implemented
DL0052 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,250 $9,000 Implemented
DL0052 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,940 $1,500 Implemented
DL0052 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,040 $720 Implemented
DL0052 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,560 $200 Implemented
DL0052 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $3,810 $560 Implemented
DL0052 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,650 $1,019 Implemented
DL0043 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,192 $0 Implemented
DL0043 # 03 Y:2009 03 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,472 $3,500 Implemented
DL0043 # 07 Y:2009 07 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,060 $0 Implemented
DL0041 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,474 $10,800 Implemented
DL0041 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,029 $1,430 Implemented
DL0041 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,520 $400 Implemented
DL0041 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,000 $348 Implemented
DL0041 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,779 $3,858 Implemented
DL0040 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $2,331 $2,350 Implemented
DL0040 # 03 Y:2009 03 2009 UPGRADE OBSOLETE EQUIPMENT $3,215 $0 Implemented
DL0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,110 $3,000 Implemented
DL0040 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,533 $38,218 Implemented
DL0032 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $19,700 $1,200 Implemented
DL0032 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,639 $31,781 Implemented
DL0032 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $8,400 $7,500 Implemented
DL0032 # 06 Y:2008 06 2008 REPLACE BOILER $6,100 $6,100 Implemented