IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0206 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $200 Implemented
LE0205 # 01 Y:2005 01 2005 $65,962 $35,000 Implemented
LE0205 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,294 $2,500 Implemented
LE0205 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
LE0196 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,639 $5,000 Implemented
LE0196 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,917 $57,000 Implemented
LE0196 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $10,457 $0 Implemented
LE0196 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,088 $0 Implemented
LE0182 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,437 $300 Implemented
LE0182 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $577 $0 Implemented
WV0278 # 02 Y:2003 02 2003 REPAIR AND ELIMINATE STEAM LEAKS $27,508 $204 Implemented
WV0278 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $23,200 $1,000 Implemented
WV0278 # 05 Y:2003 05 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $18,480 $504 Implemented
WV0278 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,418 $42 Implemented
WV0278 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,387 $7,590 Implemented
WV0278 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $3,709 $258 Implemented
WV0278 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,990 $0 Implemented
LE0135 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,451 $0 Implemented
LE0135 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,792 $0 Implemented
LE0135 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $1,066 $200 Implemented
LE0135 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $62,395 $12,000 Implemented
LE0135 # 08 Y:2002 08 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,654 $630 Implemented
RU0061 # 01 Y:1989 01 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,588 $2,880 Implemented
RU0052 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,516 $2,000 Implemented
RU0052 # 04 Y:1989 04 1989 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,292 $6,000 Implemented