IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0514 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,154 $30,844 Implemented
UF0514 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,847 $20,000 Implemented
UF0514 # 04 Y:2017 04 2017 REDUCE EXCESS STEAM BLEEDING $4,320 $0 Implemented
UF0514 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,693 $6,775 Implemented
UF0514 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,432 $0 Implemented
UF0514 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,740 $2,882 Implemented
UF0513 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,342 $27,695 Implemented
UF0513 # 08 Y:2017 08 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053 Implemented
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
UF0513 # 04 Y:2017 04 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $7,542 $0 Implemented
UF0513 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,487 $23,157 Implemented
UF0513 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $25,893 $3,150 Implemented
MI0314 # 08 Y:2017 08 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,679 $290 Implemented
MI0314 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,364 $1,125 Implemented
MI0314 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $12,009 Implemented
MI0314 # 03 Y:2017 03 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,444 $3,600 Implemented
MI0314 # 01 Y:2017 01 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,333 $6,560 Implemented
UF0507 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,676 $1,124 Implemented
UF0507 # 06 Y:2017 06 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,808 $0 Implemented
UF0507 # 04 Y:2017 04 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $814 $876 Implemented
UF0507 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,363 $210 Implemented
UF0507 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,643 $3,762 Implemented
MI0309 # 03 Y:2017 03 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,478 $320 Implemented
MI0309 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $4,544 $1,640 Implemented
MI0309 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,772 $6,223 Implemented