IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

203

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0245 # 05 Y:2013 05 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $12,407 $1,680 Implemented
MI0245 # 08 Y:2013 08 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,960 $7,502 Implemented
MI0245 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,337 $80 Implemented
MI0245 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,737 $1,660 Implemented
MI0221 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $10,726 $1,800 Implemented
MI0221 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,561 $1,660 Implemented
MI0221 # 03 Y:2012 03 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,281 $11,600 Implemented
MI0221 # 04 Y:2012 04 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,238 $80 Implemented
MI0221 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,479 $1,075 Implemented
MI0215 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,517 $8,000 Implemented
MI0215 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,815 $1,300 Implemented
MI0203 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,006 $1,320 Implemented
MI0203 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $16,812 $34,688 Implemented
MI0203 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,265 $2,500 Implemented
MI0203 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,489 $5,225 Implemented
MI0203 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,157 $50 Implemented
UF0430 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,016 $404 Implemented
UF0430 # 08 Y:2010 08 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,842 $0 Implemented
UF0430 # 04 Y:2010 04 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,547 $0 Implemented
UF0430 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,044 $0 Implemented
UF0430 # 01 Y:2010 01 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $28,959 $5,655 Implemented
UF0428 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,980 $5,895 Implemented
UF0428 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,365 $0 Implemented
UF0428 # 01 Y:2009 01 2009 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $1,734 $0 Implemented
UF0428 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,285 $0 Implemented