Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0518 # 03 Y:2018 | 03 | 2018 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,844 | $586 | Implemented |
UF0518 # 02 Y:2018 | 02 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,684 | $1,980 | Implemented |
UF0518 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,028 | $167,216 | Implemented |
UF0518 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,401 | $0 | Implemented |
UF0518 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,145 | $9,600 | Implemented |
UF0518 # 06 Y:2018 | 06 | 2018 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $109,000 | $41,200 | Implemented |
MI0337 # 11 Y:2018 | 11 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,571 | $6,578 | Implemented |
MI0337 # 10 Y:2018 | 10 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,724 | $7,314 | Implemented |
MI0337 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $14,515 | $19,215 | Implemented |
MI0337 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,813 | $2,030 | Implemented |
MI0337 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $26,104 | $3,000 | Implemented |
MI0337 # 02 Y:2018 | 02 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,184 | $480 | Implemented |
MI0337 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,349 | $76,979 | Implemented |
MI0336 # 01 Y:2018 | 01 | 2018 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,620 | $80 | Implemented |
MI0336 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,939 | $48,821 | Implemented |
MI0336 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,738 | $3,280 | Implemented |
MI0336 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,664 | $11,634 | Implemented |
MI0336 # 06 Y:2018 | 06 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,709 | $2,800 | Implemented |
MI0336 # 09 Y:2018 | 09 | 2018 | INSTALL OCCUPANCY SENSORS | $492 | $1,466 | Implemented |
MI0333 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $17,320 | $2,724 | Implemented |
MI0333 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $328 | $826 | Implemented |
MI0333 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $2,191 | $2,240 | Implemented |
MI0333 # 06 Y:2018 | 06 | 2018 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,911 | $80 | Implemented |
MI0333 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,026 | $13,843 | Implemented |
MI0333 # 04 Y:2018 | 04 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $7,399 | $15,000 | Implemented |