IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0321 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $15,954 $436 Implemented
UF0321 # 08 Y:2003 08 2003 $18,000 $4,000 Implemented
UF0322 # 03 Y:2003 03 2003 ADD AREA LIGHTING SWITCHES $8,639 $303 Implemented
UF0322 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47,174 $0 Implemented
MI0057 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $3,177 $1,160 Implemented
MI0057 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,443 $400,000 Implemented
MI0057 # 08 Y:2003 08 2003 METER WASTE WATER $12,786 $1,950 Implemented
MI0056 # 02 Y:2003 02 2003 $281,112 $88,736 Implemented
MI0056 # 05 Y:2003 05 2003 REPAIR OR REPLACE STEAM TRAPS $7,955 $904 Implemented
MI0056 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,054 $40,600 Implemented
MI0056 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $500,000 $43,000 Implemented
MI0056 # 08 Y:2003 08 2003 METER WASTE WATER $25,572 $1,950 Implemented
UF0320 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $25,707 $48,985 Implemented
UF0320 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,161 $225 Implemented
UF0320 # 08 Y:2003 08 2003 $7,009 $4,000 Implemented
UF0320 # 09 Y:2003 09 2003 $448,198 $37,200 Implemented
UF0319 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,379 $9,534 Implemented
UF0319 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $1,277 $825 Implemented
UF0319 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,620 $0 Implemented
MI0054 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,099 $50 Implemented
UF0318 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,293 $340 Implemented
UF0318 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,807 $24,950 Implemented
UF0318 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,202 $0 Implemented
UF0318 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,449 $0 Implemented
UF0318 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,037 $13,339 Implemented