IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0154 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $30,511 $120 Implemented
UF0404 # 07 Y:2007 07 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,571 $15,174 Implemented
UF0404 # 01 Y:2007 01 2007 USE OPTIMUM THICKNESS INSULATION $45,739 $1,287 Implemented
UF0404 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,000 $270 Implemented
UF0404 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $10,863 $369 Implemented
UF0404 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $603 $230 Implemented
UF0404 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,133 $15,174 Implemented
UF0402 # 03 Y:2007 03 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $335 $177 Implemented
UF0402 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $3,641 $194 Implemented
UF0402 # 10 Y:2007 10 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,194 $390 Implemented
UF0402 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,214 $0 Implemented
UF0402 # 13 Y:2007 13 2007 $24,897 $0 Implemented
UF0403 # 01 Y:2007 01 2007 USE PHOTOCELL CONTROLS $3,552 $792 Implemented
UF0403 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $266 $144 Implemented
UF0403 # 10 Y:2007 10 2007 INSTALL SET-BACK TIMERS $1,702 $159 Implemented
UF0403 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,932 $507 Implemented
UF0403 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,880 $184 Implemented
UF0403 # 06 Y:2007 06 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,878 $251 Implemented
MI0150 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,220 $30 Implemented
MI0150 # 09 Y:2007 09 2007 $1,658 $300 Implemented
MI0149 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,814 $120 Implemented
MI0149 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,030 $1,074 Implemented
MI0147 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,498 $1,750 Implemented
MI0147 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,305 $7,878 Implemented
MI0147 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,581 $16,000 Implemented