IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

559

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0870 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,245 $20,050 Implemented
GT0870 # 01 Y:2009 01 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $625 $0 Implemented
GT0867 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,440 $0 Implemented
GT0867 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,518 $6,000 Implemented
GT0867 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,426 $3,250 Implemented
GT0867 # 02 Y:2009 02 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,794 $4,000 Implemented
GT0846 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $61,777 $40,000 Implemented
GT0846 # 02 Y:2008 02 2008 USE MINIMUM STEAM OPERATING PRESSURE $16,146 $15,536 Implemented
GT0846 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $59,040 $65,000 Implemented
GT0846 # 07 Y:2008 07 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $155,720 $30,000 Implemented
GT0846 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,504 $70,103 Implemented
GT0844 # 09 Y:2007 09 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $323,139 $174,963 Implemented
GT0842 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $5,980 $1,603 Implemented
GT0842 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,090 $3,900 Implemented
GT0842 # 06 Y:2007 06 2007 USE WATER-BASED ADHESIVES $1,960 $0 Implemented
GT0842 # 07 Y:2007 07 2007 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $63,520 $7,000 Implemented
GT0834 # 01 Y:2007 01 2007 MODIFY TEXTILE DRYERS $47,625 $36,000 Implemented
GT0834 # 05 Y:2007 05 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,013 $2,000 Implemented
GT0834 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,074 $1,074 Implemented
GT0834 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,448 $5,454 Implemented
GT0834 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,690 $6,290 Implemented
GT0834 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $11,479 Implemented
GT0828 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,977 $86,662 Implemented
GT0828 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,350 $350 Implemented
GT0828 # 04 Y:2006 04 2006 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,909 $0 Implemented