IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0741 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,970 $15,430 Implemented
GT0741 # 04 Y:2002 04 2002 USE SYNTHETIC LUBRICANT $9,470 $0 Not Implemented
GT0741 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,490 $2,100 Not Implemented
GT0741 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $204 $0 Not Implemented
GT0741 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $80,749 $0 Implemented
GT0727 # 08 Y:2002 08 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,468 $321,854 Implemented
GT0727 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $147,500 $181,000 Not Implemented
GT0727 # 06 Y:2002 06 2002 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $679,000 $250,000 Not Implemented
GT0727 # 05 Y:2002 05 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $165,202 $0 Not Implemented
GT0727 # 04 Y:2002 04 2002 REDESIGN PROCESS $2,159,550 $0 Implemented
GT0727 # 03 Y:2002 03 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,527,000 $4,140,000 Not Implemented
GT0727 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,807,000 $0 Implemented
GT0727 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $563,200 $1,563,200 Not Implemented
GT0719 # 01 Y:2001 01 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $80,000 $125,000 n/a
GT0719 # 02 Y:2001 02 2001 $18,750 $1,500 n/a
GT0719 # 03 Y:2001 03 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $44,105 $12,500 n/a
GT0719 # 04 Y:2001 04 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $30,490 $8,220 n/a
GT0719 # 05 Y:2001 05 2001 INSTALL TIMERS AND/OR THERMOSTATS $467 $400 n/a
GT0719 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,740 $900 n/a
GT0676 # 02 Y:1999 02 1999 RECOVER AND REUSE WASTE MATERIAL $11,148 $0 Implemented
GT0676 # 01 Y:1999 01 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,081 $500 Not Implemented
GT0676 # 07 Y:1999 07 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,295 $100 Not Implemented
GT0676 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $16,324 $35,000 Not Implemented
GT0676 # 06 Y:1999 06 1999 COMBINE UTILITY METERS $292 $0 Not Implemented
GT0676 # 04 Y:1999 04 1999 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $20,293 $15,000 Not Implemented