Search recommendations based on selected criteria.
RESET

2,143

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
GT0914 # 06 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,676 $26,357
GT0914 # 02 Y:2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $18,164 $400
GT0912 # 06 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,774 $17,795
GT0912 # 01 Y:2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,273 $150
GT0912 # 02 Y:2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,530 $142
GT0912 # 03 Y:2018 INSULATE BARE EQUIPMENT $39,033 $804
UA0189 # 06 Y:2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,357 $3,000
UA0189 # 05 Y:2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,704 $100
UA0189 # 04 Y:2018 USE MORE EFFICIENT LIGHT SOURCE $5,745 $5,828
UA0189 # 03 Y:2018 USE MINIMUM STEAM OPERATING PRESSURE $3,482 $50
GT0911 # 04 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $5,633
GT0911 # 03 Y:2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $310 $180
GT0911 # 02 Y:2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,999 $3,000
GT0910 # 03 Y:2018 INSULATE BARE EQUIPMENT $541 $1,237
GT0910 # 02 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,351 $14,618
Back to Top