IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0781 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $98,900 $253,400 Not Implemented
GT0781 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $7,300 Implemented
GT0783 # 01 Y:2004 01 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,670 $3,000 Not Implemented
GT0783 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $1,250 Implemented
GT0783 # 03 Y:2004 03 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,110 $3,700 Not Implemented
GT0783 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $35,410 $0 Implemented
GT0783 # 05 Y:2004 05 2004 METER WASTE WATER $33,200 $2,000 Implemented
GT0783 # 06 Y:2004 06 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,190 $1,020 Implemented
GT0783 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,242 $20,982 Implemented
GT0783 # 08 Y:2004 08 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,875 $655 Implemented
GT0783 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $5,000 $1,500 Implemented
GT0786 # 01 Y:2004 01 2004 MAINTAIN MACHINES TO REDUCE LEAKS $121,900 $45,000 Implemented
GT0786 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $33,950 $38,000 Not Implemented
GT0786 # 03 Y:2004 03 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $33,280 $25,000 Not Implemented
GT0786 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,700 $22,500 Not Implemented
GT0786 # 05 Y:2004 05 2004 CLEAN CONDENSER TUBES $22,690 $3,000 Implemented
GT0786 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,500 $0 Not Implemented
GT0786 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,600 $35 Implemented
GT0786 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,040 $3,737 Not Implemented
GT0785 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,100 $0 Not Implemented
GT0785 # 02 Y:2004 02 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,460 $0 Not Implemented
GT0785 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,870 $0 Implemented
GT0785 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,757 $1,200 Not Implemented
GT0785 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,570 $2,240 Not Implemented
GT0785 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $223 $150 Not Implemented