IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0850 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,237 $7,000 Not Implemented
GT0850 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,982 $40,482 Not Implemented
GT0850 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,544 $1,580 Not Implemented
GT0849 # 01 Y:2008 01 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $98,980 $0 Not Implemented
GT0849 # 02 Y:2008 02 2008 BURN WOOD BY-PRODUCTS FOR HEAT $175,600 $100,000 Not Implemented
GT0849 # 03 Y:2008 03 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $57,260 $0 Not Implemented
GT0849 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $292,310 $18,200 Implemented
GT0849 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $35,083 $40,800 Not Implemented
GT0849 # 06 Y:2008 06 2008 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $228,740 $900,000 Not Implemented
GT0848 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $11,250 $19,500 Not Implemented
GT0848 # 02 Y:2008 02 2008 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $180,800 $541,073 Not Implemented
GT0848 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $1,000 Implemented
GT0848 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,718 $3,250 Implemented
GT0848 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,088 $0 Implemented
GT0848 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,164 $10,000 Not Implemented
GT0847 # 01 Y:2008 01 2008 USE BUILDING MATERIALS WHICH REQUIRE LESS ENERGY TO PRODUCE $153,731 $0 Not Implemented
GT0847 # 02 Y:2008 02 2008 REUSE SCRAP GLASS AS FEED STOCK $729,921 $850,000 Implemented
GT0847 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $798,070 $1,116,000 Not Implemented
GT0847 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $788,500 $514,500 Not Implemented
GT0847 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,596 $8,400 Not Implemented
GT0847 # 06 Y:2008 06 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $22,551 $68,143 Not Implemented
GT0846 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $61,777 $40,000 Implemented
GT0846 # 02 Y:2008 02 2008 USE MINIMUM STEAM OPERATING PRESSURE $16,146 $15,536 Implemented
GT0846 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $830 $1,094 Not Implemented
GT0846 # 04 Y:2008 04 2008 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,989 $26,900 Not Implemented