IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0071 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $349 $660 Implemented
BS0071 # 04 Y:2016 04 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $765 $2,575 Implemented
BS0071 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $372 $384 Not Implemented
BS0066 # 07 Y:2015 07 2015 OPTIMIZE PLANT POWER FACTOR $12,093 $25,245 Not Implemented
BS0066 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $702 $5,938 Not Implemented
BS0066 # 06 Y:2015 06 2015 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $13,061 $19,065 Not Implemented
BS0066 # 05 Y:2015 05 2015 COMBINE UTILITY METERS $258 $253 Not Implemented
BS0066 # 04 Y:2015 04 2015 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,249 $80 Not Implemented
BS0066 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,531 $26 Not Implemented
BS0066 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,458 $568 Not Implemented
BS0066 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,219 $907 Not Implemented
BS0059 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $178 $91 Not Implemented
BS0059 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,254 $526 Implemented
BS0059 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,386 $9,729 Implemented
BS0059 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $12,761 $18,045 Implemented
BS0059 # 02 Y:2015 02 2015 UPGRADE CONTROLS ON COMPRESSORS $5,532 $1,105 Not Implemented
BS0059 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $744 $264 Not Implemented
BS0059 # 07 Y:2015 07 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $368 $4,065 Not Implemented
BS0059 # 08 Y:2015 08 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $25 $929 Not Implemented
BS0033 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $263 $168 Not Implemented
BS0033 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33 $160 Not Implemented
BS0033 # 10 Y:2014 10 2014 INSTALL TIMERS AND/OR THERMOSTATS $21,246 $1,547 Not Implemented
BS0033 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,767 $23,688 Not Implemented
BS0033 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $2,179 $360 Not Implemented
BS0033 # 06 Y:2014 06 2014 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,800 $2,668 Not Implemented