IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

350

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0315 # 11 Y:2006 11 2006 $10,530 $7,000 Not Implemented
IC0113 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $17,370 $48,900 Not Implemented
IC0113 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $10,036 $0 Implemented
IC0113 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,683 $66,529 Implemented
IC0113 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,398 $8,517 Implemented
IC0113 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $900 Implemented
IC0113 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,373 $0 Not Implemented
BD0299 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,732 $3,640 Not Implemented
BD0299 # 02 Y:2006 02 2006 USE RADIANT HEATER FOR SPOT HEATING $1,386 $3,200 Not Implemented
BD0299 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $483 $105 Not Implemented
BD0299 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $485 $143 Not Implemented
BD0299 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $482 $220 Not Implemented
BD0299 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $432 $210 Not Implemented
BD0299 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $225 $60 Not Implemented
IC0082 # 01 Y:2004 01 2004 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $158,811 $0 Implemented
IC0082 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $212,513 $1,533 Not Implemented
IC0082 # 03 Y:2004 03 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $295,385 $90,783 Implemented
IC0082 # 04 Y:2004 04 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $54,932 $8,421 Implemented
IC0082 # 05 Y:2004 05 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,283 $1,450 Implemented
IC0082 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,495 $470,000 Not Implemented
IC0082 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $311 $282,150 Implemented
IC0082 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $516 $600,000 Not Implemented
IC0086 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,905 $2,900 Implemented
IC0086 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $9,924 $1,130 Not Implemented
IC0086 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,738 $43,650 Implemented