IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0148 # 08 Y:2008 08 2008 TREAT AND REUSE RINSE WATERS $21,012 $27,696 Not Implemented
BD0333 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $1,570 $901 Implemented
BD0333 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $476 Implemented
BD0333 # 03 Y:2007 03 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $36,206 $15,001 Not Implemented
BD0333 # 04 Y:2007 04 2007 USE RADIANT HEATER FOR SPOT HEATING $73,372 $30,001 Not Implemented
BD0333 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $67,989 $35,001 Not Implemented
BD0333 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $526 Implemented
BD0333 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $378 $2 Implemented
BD0333 # 08 Y:2007 08 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $66,946 $2 Not Implemented
IC0118 # 01 Y:2006 01 2006 RECOVER AND REUSE SPENT ACID BATHS $2,605 $0 Implemented
IC0118 # 02 Y:2006 02 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,699 $8,628 Implemented
IC0118 # 03 Y:2006 03 2006 USE RADIANT HEATER FOR SPOT HEATING $6,871 $6,000 Implemented
IC0118 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,612 $0 Implemented
IC0118 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,583 $17,220 Implemented
IC0118 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,328 $8,717 Implemented
IC0118 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,403 $2,544 Implemented
IC0118 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $953 $1,200 Implemented
IC0118 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $428 $516 Implemented
IC0118 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $235 $1,132 Implemented
IC0118 # 11 Y:2006 11 2006 INSTALL OCCUPANCY SENSORS $62 $291 Not Implemented
BD0292 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,591 $36,320 Implemented
BD0292 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,594 $7,360 Implemented
BD0292 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,205 $25,000 Implemented
BD0292 # 04 Y:2005 04 2005 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $11,542 $5,600 Not Implemented
BD0292 # 05 Y:2005 05 2005 HEAT WATER WITH EXHAUST HEAT $9,106 $17,512 Not Implemented