IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0298 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,193 $0 Not Implemented
WI0298 # 05 Y:1997 05 1997 $24,000 $20,000 Implemented
WI0298 # 06 Y:1997 06 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,119 $18,000 Not Implemented
WI0298 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $2,100 $1,000 Not Implemented
WI0298 # 08 Y:1997 08 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $686 $0 Not Implemented
WI0298 # 09 Y:1997 09 1997 $140 $0 Not Implemented
WI0290 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $119,620 $15,000 Implemented
WI0290 # 02 Y:1997 02 1997 REDUCE VENTILATION AIR $10,493 $15,000 Not Implemented
WI0290 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,560 $5,000 Implemented
WI0290 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,200 $15,000 Not Implemented
WI0290 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,755 $330 Implemented
WI0290 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,526 $1,380 Not Implemented
WI0290 # 07 Y:1997 07 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,982 $0 Not Implemented
WI0290 # 08 Y:1997 08 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,333 $500 Implemented
WI0290 # 09 Y:1997 09 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,280 $1,120 Implemented
WI0290 # 10 Y:1997 10 1997 $784 $0 Not Implemented
BD0069 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $5,002 $3,225 Not Implemented
BD0069 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,228 $4,228 Not Implemented
BD0069 # 03 Y:1996 03 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,652 $2,000 Implemented
BD0069 # 04 Y:1996 04 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,520 $1,950 Not Implemented
BD0069 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $3,591 Implemented
BD0069 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $400 Not Implemented
BD0069 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $2,159 $3,500 Not Implemented
WI0257 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,977 $0 Not Implemented
WI0257 # 02 Y:1996 02 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $5,468 $15,000 Not Implemented