IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0110 # 10 Y:2018 10 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,081 $30,250 Implemented
IP0110 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $21,079 $3,360 Implemented
IP0110 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,835 $130 Implemented
IP0110 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,973 $5 Implemented
IP0068 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $5,648 Implemented
IP0068 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $500 $285 Implemented
IP0068 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $491 $159 Implemented
IP0068 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $688 $5 Implemented
IP0068 # 01 Y:2016 01 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $759 $4 Implemented
IP0017 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,754 $409 Implemented
IP0017 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $9,348 Implemented
IP0017 # 09 Y:2013 09 2013 COVER OPEN TANKS $373 $503 Implemented
IP0017 # 06 Y:2013 06 2013 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $600 $159 Implemented
IP0017 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,167 $1,400 Implemented
IP0017 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $805 $0 Implemented
IP0017 # 02 Y:2013 02 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,701 $0 Implemented
IC0106 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $32,401 $6,800 Implemented
IC0106 # 01 Y:2005 01 2005 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $19,946 $16,320 Implemented
IC0106 # 12 Y:2005 12 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,545 $890 Implemented
IC0106 # 11 Y:2005 11 2005 INSTALL TIMERS AND/OR THERMOSTATS $16,926 $20,423 Implemented
IC0106 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $69,451 $120,000 Implemented
IC0106 # 08 Y:2005 08 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,651 $1,902 Implemented
IC0106 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $0 Implemented
IC0106 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $513 $107 Implemented
IC0106 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $6,280 $46,950 Implemented