IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0030 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $442 $227 Implemented
IP0030 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,493 $280 Implemented
IP0030 # 02 Y:2014 02 2014 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $5,730 $124 Implemented
IP0030 # 01 Y:2014 01 2014 INSTALL SET-BACK TIMERS $4,377 $35 Implemented
IP0001 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,247 $0 Implemented
IP0001 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $93 $0 Implemented
IP0001 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,200 $8,348 Implemented
IP0001 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,942 $80,000 Implemented
UM0349 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $5,172 $1,840 Implemented
UM0349 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $100 Implemented
UM0349 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,531 $3,168 Implemented
UM0349 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,327 $1,000 Implemented
UD0748 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $303 $108 Implemented
UD0748 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,200 $840 Implemented
UD0748 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $7,546 $0 Implemented
UD0735 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $212,325 $9,000 Implemented
UD0735 # 03 Y:2006 03 2006 RECOVER MECHANICAL ENERGY $33,450 $32 Implemented
UD0735 # 06 Y:2006 06 2006 DISCONNECT BALLASTS $9,527 $1,440 Implemented
UD0735 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $5,203 $21,789 Implemented
UD0735 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,665 $0 Implemented
UD0735 # 14 Y:2006 14 2006 USE PHOTOCELL CONTROLS $733 $308 Implemented
UD0735 # 16 Y:2006 16 2006 INSULATE BARE EQUIPMENT $245 $110 Implemented
UM0267 # 05 Y:2004 05 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,938 $2,615 Implemented
UM0267 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $11,902 $21,150 Implemented
UM0267 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,675 $20,137 Implemented