IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0010 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,108 $1,795 Implemented
IP0010 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $446 $0 Implemented
IP0010 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,822 $0 Implemented
IP0010 # 11 Y:2013 11 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $18,512 $51,858 Not Implemented
IP0010 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $1,488 $430 Not Implemented
IP0010 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $17,755 $1,700 Not Implemented
IP0010 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,207 $2,916 Not Implemented
IP0010 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,962 $107 Implemented
IP0010 # 07 Y:2013 07 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $571 $221 Implemented
IP0010 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $103 $70 Not Implemented
IP0010 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $2,850 $8,526 Implemented
IP0010 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,469 $15,876 Implemented
UM0268 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,159 $14,530 Not Implemented
UM0268 # 02 Y:2004 02 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,888 $840 Implemented
IC0048 # 09 Y:2002 09 2002 $364,437 $18,654 Not Implemented
IC0048 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $7,063 $0 Implemented
IC0048 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,279 $10,600 Implemented
IC0048 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $56,765 $35,050 Implemented
IC0048 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $71,006 $3,130 Not Implemented
IC0048 # 05 Y:2002 05 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $40,640 $108,000 Not Implemented
IC0048 # 06 Y:2002 06 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $472,157 $1,500,000 Not Implemented
IC0048 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $17,986 $0 Implemented
IC0048 # 08 Y:2002 08 2002 REDUCE OR ELIMINATE WASTE $249,587 $207,024 Not Implemented
IC0031 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,800 $3,080 Implemented
IC0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $2,894 Implemented