IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0446 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $529 $0 Implemented
KU0384 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,255 $100 Implemented
KU0384 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,309 $2,000 Implemented
KU0384 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55 $0 Implemented
KU0384 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $477 $600 Implemented
KU0365 # 02 Y:1992 02 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $31,766 Implemented
KU0365 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,768 $887 Implemented
KU0365 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,302 $540 Implemented
KU0365 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $250 Implemented
KU0363 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,829 $0 Implemented
KU0363 # 04 Y:1992 04 1992 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $207 $0 Implemented
KU0363 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $181 $200 Implemented
OK0360 # 01 Y:1991 01 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,269 $135 Implemented
OK0360 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,965 $0 Implemented
OK0360 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,917 $1,000 Implemented
KU0350 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $36,079 $0 Implemented
KU0350 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,101 $12,000 Implemented
KU0350 # 03 Y:1991 03 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,192 $7,440 Implemented
KU0350 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $995 $550 Implemented
KU0350 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $950 Implemented
KU0350 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,198 $1,230 Implemented
KU0350 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $692 $450 Implemented
KU0350 # 08 Y:1991 08 1991 COVER OPEN TANKS $212 $350 Implemented
KU0339 # 01 Y:1991 01 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,004 $700 Implemented
KU0339 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,315 $1,860 Implemented