Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0361 # 01 Y:1991 | 01 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $307 | $403 | Not Implemented |
OK0361 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,198 | $107 | Not Implemented |
OK0361 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,285 | $0 | Not Implemented |
OK0361 # 07 Y:1991 | 07 | 1991 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,356 | $4,600 | Not Implemented |
OK0361 # 04 Y:1991 | 04 | 1991 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,521 | $13,526 | Not Implemented |
OK0361 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $756 | $0 | Not Implemented |
OK0361 # 03 Y:1991 | 03 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $3,012 | $1,050 | Not Implemented |
OK0360 # 01 Y:1991 | 01 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,269 | $135 | Implemented |
OK0360 # 03 Y:1991 | 03 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,917 | $1,000 | Implemented |
OK0360 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,965 | $0 | Implemented |
OK0359 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,656 | $0 | Implemented |
KU0351 # 04 Y:1991 | 04 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,047 | $1,600 | Implemented |
KU0351 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,664 | $744 | Implemented |
KU0351 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $5,020 | $3,380 | Implemented |
OK0359 # 03 Y:1991 | 03 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,430 | $2,053 | Implemented |
OK0359 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,638 | $0 | Implemented |
KU0351 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $693 | $400 | Implemented |
KU0351 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $662 | $0 | Implemented |
KU0350 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $550 | $950 | Implemented |
KU0350 # 06 Y:1991 | 06 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,198 | $1,230 | Implemented |
KU0350 # 07 Y:1991 | 07 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $692 | $450 | Implemented |
KU0349 # 10 Y:1991 | 10 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $222 | $380 | Not Implemented |
KU0349 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $1,110 | $200 | Not Implemented |
KU0349 # 02 Y:1991 | 02 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,460 | $2,800 | Not Implemented |
KU0349 # 01 Y:1991 | 01 | 1991 | ISOLATE HOT OR COLD EQUIPMENT | $4,092 | $5,200 | Not Implemented |