Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0753 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,439 | $4,489 | Not Implemented |
OK0753 # 08 Y:2007 | 08 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000 | $0 | Not Implemented |
OK0753 # 07 Y:2007 | 07 | 2007 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,437 | $13,500 | Not Implemented |
OK0753 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,715 | $4,795 | Not Implemented |
OK0753 # 05 Y:2007 | 05 | 2007 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $387,006 | $553,000 | Not Implemented |
OK0753 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $4,874 | $9,950 | Not Implemented |
OK0753 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,786 | $3,600 | Not Implemented |
OK0753 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,594 | $289 | Not Implemented |
OK0753 # 01 Y:2007 | 01 | 2007 | OPTIMIZE PLANT POWER FACTOR | $49,649 | $0 | Implemented |
OK0751 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,572 | $2,401 | Not Implemented |
OK0751 # 03 Y:2007 | 03 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,188 | $200 | Not Implemented |
OK0751 # 02 Y:2007 | 02 | 2007 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $59,692 | $201,700 | Not Implemented |
OK0748 # 07 Y:2007 | 07 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,337 | $8,477 | Not Implemented |
OK0748 # 06 Y:2007 | 06 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $34,710 | $1,002 | Not Implemented |
OK0748 # 05 Y:2007 | 05 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $22,467 | $1,029 | Implemented |
OK0748 # 04 Y:2007 | 04 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $22,448 | $2,495 | Implemented |
OK0748 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $6,840 | Implemented |
OK0748 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,523 | $559 | Implemented |
OK0748 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,664 | $3,013 | Implemented |
OK0742 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,095 | $79,680 | Not Implemented |
OK0742 # 05 Y:2007 | 05 | 2007 | INSULATE BARE EQUIPMENT | $2,516 | $3,910 | Implemented |
OK0742 # 04 Y:2007 | 04 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,966 | $5,529 | Not Implemented |
OK0742 # 03 Y:2007 | 03 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,664 | $275 | Implemented |
OK0742 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,095 | $3,851 | Not Implemented |