Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,802
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2305 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,763 | $9,750 | Not Implemented |
UL2305 # 07 Y:2023 | 07 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $29,120 | $60,633 | Not Implemented |
UL2305 # 08 Y:2023 | 08 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,779 | $0 | Implemented |
TT0296 # 11 Y:2023 | 11 | 2023 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $2,853 | $7,500 | n/a |
TT0296 # 10 Y:2023 | 10 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $203,680 | $300,000 | n/a |
TT0296 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,690 | $8,100 | n/a |
TT0296 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,078 | $4,500 | n/a |
TT0296 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $41,037 | $32,500 | n/a |
TT0296 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $81,000 | $60,000 | n/a |
TT0296 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,264 | $1,920 | n/a |
TT0296 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $22,207 | $1,640 | n/a |
TT0296 # 03 Y:2023 | 03 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $200,000 | $10,000 | n/a |
TT0296 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $66,640 | $2,000 | n/a |
TT0296 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,069 | $270 | n/a |
UL2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,408 | $2,832 | Implemented |
UL2301 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,141 | $9,184 | Not Implemented |
UL2301 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,531 | $260,163 | Not Implemented |
UL2301 # 04 Y:2023 | 04 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,944 | $0 | Not Implemented |
UL2301 # 05 Y:2023 | 05 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $85,200 | $50,198 | Not Implemented |
UL2304 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,568 | $26,328 | Implemented |
UL2304 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $294,679 | $268,088 | Not Implemented |
UL2304 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,148 | $36,675 | Not Implemented |
UL2304 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,501 | $89,882 | Not Implemented |
UL2304 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,246 | $1,300 | Implemented |
UL2304 # 06 Y:2023 | 06 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $84,650 | $36,445 | Not Implemented |