IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0653 # 01 Y:2009 01 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $110,550 $270,000 Not Implemented
MA0653 # 02 Y:2009 02 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $37,210 $68,000 Not Implemented
MA0653 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $16,188 $752 Implemented
MA0653 # 04 Y:2009 04 2009 CLOSE OFF UNNEEDED STEAM LINES $3,551 $500 Not Implemented
MA0653 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,840 $7,510 Implemented
MA0653 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $6,125 Not Implemented
MA0641 # 02 Y:2008 02 2008 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $3,484 $3,300 Not Implemented
MA0641 # 01 Y:2008 01 2008 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $280,575 $3,040,000 Not Implemented
MA0641 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $3,028 $3,000 Implemented
MA0599 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,495 $3,700 Not Implemented
MA0599 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $89,422 $172,300 Not Implemented
MA0599 # 08 Y:2006 08 2006 REDUCE FLUID FLOW RATES $2,270 $600 Implemented
MA0599 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $600 Implemented
MA0599 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,051 $7,865 Implemented
MA0599 # 06 Y:2006 06 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,260 $1,190 Not Implemented
MA0599 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $10,010 $5,280 Implemented
MA0599 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,780 $12,325 Implemented
MA0599 # 03 Y:2006 03 2006 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,205 $10,250 Implemented
MA0577 # 02 Y:2005 02 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $52,930 $50,000 Implemented
MA0577 # 06 Y:2005 06 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,784 $40,425 Implemented
MA0577 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,371 $300 Implemented
MA0577 # 04 Y:2005 04 2005 INSTALL TIMERS AND/OR THERMOSTATS $28,600 $980 Implemented
MA0577 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,138 $58,000 Implemented
MA0577 # 01 Y:2005 01 2005 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $75,813 $205,500 Implemented
MA0571 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,977 $25,856 Implemented