IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

415

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
MA0606 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $285,051 $60,000 Not Implemented
MA0606 # 12 Y:2006 12 2006 OPTIMIZE PLANT POWER FACTOR $14,940 $11,400 Not Implemented
MA0606 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,776 $27,573 Not Implemented
MA0606 # 10 Y:2006 10 2006 USE OPTIMUM TEMPERATURE $79,097 $21,125 Not Implemented
MA0606 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,360 $195,000 Not Implemented
MA0606 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130,688 $6,000 Implemented
MA0606 # 07 Y:2006 07 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $132,608 $196,800 Not Implemented
MA0606 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $89,232 $165,000 Not Implemented
MA0606 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $169,598 $120,520 Not Implemented
MA0606 # 03 Y:2006 03 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $55,708 $2,000 Not Implemented
MA0606 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $298,083 $2,000 Not Implemented
MA0606 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $617,366 $36,000 Not Implemented
MA0597 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $25,107 $85,300 Not Implemented
MA0597 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,984 $17,660 Implemented
MA0597 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,643 $17,818 Implemented
MA0597 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $4,902 $1,000 Implemented
MA0597 # 05 Y:2006 05 2006 $3,292 $19,000 Not Implemented
MA0597 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $2,161 $668 Implemented
MA0597 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,402 $0 Implemented
MA0597 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $909 $775 Not Implemented
MA0568 # 01 Y:2005 01 2005 $174,960 $252,000 Not Implemented
MA0568 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,082 $7,750 Implemented
MA0568 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,788 $12,000 Implemented
MA0568 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $5,122 $6,750 Implemented