Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0421 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,035 | $9,615 | Not Implemented |
MA0421 # 02 Y:1998 | 02 | 1998 | BURN A LESS EXPENSIVE GRADE OF FUEL | $77,003 | $200,000 | Not Implemented |
MA0421 # 01 Y:1998 | 01 | 1998 | BURN A LESS EXPENSIVE GRADE OF FUEL | $471,027 | $984,000 | Not Implemented |
MA0421 # 08 Y:1998 | 08 | 1998 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $268 | $472 | Not Implemented |
MA0421 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,867 | $0 | Not Implemented |
MA0421 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,501 | $22,284 | Not Implemented |
MA0421 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,397 | $5,000 | Not Implemented |
MA0421 # 07 Y:1998 | 07 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $917 | $8,530 | Not Implemented |
MA0427 # 05 Y:1998 | 05 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,533 | $2,700 | Not Implemented |
MA0427 # 08 Y:1998 | 08 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $836 | $200 | Implemented |
MA0427 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,159 | $1,840 | Not Implemented |
MA0427 # 06 Y:1998 | 06 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,828 | $426 | Implemented |
MA0427 # 04 Y:1998 | 04 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $4,093 | $4,800 | Not Implemented |
MA0427 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,885 | $242 | Not Implemented |
MA0427 # 02 Y:1998 | 02 | 1998 | OPTIMIZE PLANT POWER FACTOR | $5,715 | $7,055 | Implemented |
MA0427 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,186 | $19,050 | Implemented |
MA0424 # 06 Y:1998 | 06 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,474 | $5,800 | Not Implemented |
MA0424 # 02 Y:1998 | 02 | 1998 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,538 | $30,400 | Implemented |
MA0424 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,568 | $0 | Implemented |
MA0424 # 04 Y:1998 | 04 | 1998 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $12,411 | $10,638 | Not Implemented |
MA0424 # 01 Y:1998 | 01 | 1998 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $263,073 | $1,000,000 | Not Implemented |
MA0424 # 03 Y:1998 | 03 | 1998 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,197 | $21,808 | Not Implemented |
MA0419 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,822 | $9,000 | Implemented |
MA0419 # 06 Y:1998 | 06 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,967 | $0 | Implemented |
MA0419 # 07 Y:1998 | 07 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,739 | $0 | Implemented |