IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0822 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,003 $6,741 Implemented
MA0822 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $78,975 $422,509 Implemented
MA0822 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,485 $4,500 Not Implemented
MA0821 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $23,275 Not Implemented
MA0821 # 01 Y:2020 01 2020 USE MINIMUM SAFE OVEN VENTILATION $48,924 $61,470 Not Implemented
MA0821 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $490 $1,785 Not Implemented
MA0821 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $997 $1,400 Not Implemented
MA0820 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $30,760 $129,192 Not Implemented
MA0820 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $204 $200 Implemented
MA0820 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $723 $300 Implemented
MA0820 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,673 $7,900 Not Implemented
MA0820 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,862 $11,220 Not Implemented
MA0819 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,721 $2,930 Not Implemented
MA0819 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,833 $1,000 Not Implemented
MA0819 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,022 $217,000 Implemented
MA0819 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,315 $92,400 Not Implemented
MA0818 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $782 $2,450 Not Implemented
MA0818 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,320 $9,808 Implemented
MA0818 # 03 Y:2020 03 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,714 $5,600 Not Implemented
MA0818 # 05 Y:2020 05 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $789 $1,700 Implemented
MA0818 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $837 $4,000 Not Implemented
MA0818 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $500 Implemented
MA0818 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,422 $970 Not Implemented
MA0817 # 03 Y:2020 03 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,042 $100 Not Implemented
MA0817 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,876 $50 Implemented