Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0242 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,195 | $1,000 | Not Implemented |
UM0242 # 01 Y:2003 | 01 | 2003 | INSTALL OCCUPANCY SENSORS | $9,740 | $6,270 | Not Implemented |
UM0242 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $4,180 | $645 | Not Implemented |
UM0242 # 04 Y:2003 | 04 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,040 | $1,100 | Not Implemented |
UM0242 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,670 | $300 | Not Implemented |
UM0242 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $2,170 | Not Implemented |
UM0241 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $75 | Implemented |
UM0241 # 05 Y:2003 | 05 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,275 | $2,100 | Implemented |
UM0241 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,270 | $10,510 | Implemented |
UM0241 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,900 | $4,800 | Not Implemented |
UM0241 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,350 | $8,000 | Implemented |
UM0241 # 01 Y:2003 | 01 | 2003 | $573,000 | $390,000 | Not Implemented | |
UM0230 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,479 | $300 | Not Implemented |
UM0230 # 06 Y:2003 | 06 | 2003 | USE OPTIMUM THICKNESS INSULATION | $4,200 | $1,500 | Not Implemented |
UM0230 # 05 Y:2003 | 05 | 2003 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $37,100 | $171,200 | Not Implemented |
UM0230 # 04 Y:2003 | 04 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,688 | $8,100 | n/a |
UM0230 # 03 Y:2003 | 03 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,163 | $4,500 | Implemented |
UM0230 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,775 | $18,691 | Not Implemented |
UM0224 # 11 Y:2003 | 11 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,270 | $10,000 | Not Implemented |
UM0224 # 09 Y:2003 | 09 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,650 | $120 | Implemented |
UM0224 # 08 Y:2003 | 08 | 2003 | INSTALL STEAM TRAP | $1,031 | $4,360 | Not Implemented |
UM0224 # 06 Y:2003 | 06 | 2003 | USE EVAPORATION TO CONCENTRATE MATERIAL | $57,600 | $19,600 | Not Implemented |
UM0224 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $26,100 | $7,230 | Implemented |
UM0224 # 04 Y:2003 | 04 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $51,840 | $5,520 | Implemented |
UM0224 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $21,643 | $15,930 | Implemented |