IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

199

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0341 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,835 $4,800 Not Implemented
UM0341 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,572 $5,000 Not Implemented
UM0341 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,111 $8,160 Not Implemented
UM0341 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,356 $515 Not Implemented
UM0341 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $31,965 $59,142 Not Implemented
UM0341 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $79,804 $53,414 Implemented
UM0341 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $101,548 $18,088 Not Implemented
UM0290 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,868 $2,650 Implemented
UM0290 # 04 Y:2005 04 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,753 $6,230 Implemented
UM0290 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $7,943 $12,500 Not Implemented
UM0290 # 07 Y:2005 07 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $365 $720 Implemented
UM0290 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,268 $11,077 Implemented
UM0290 # 05 Y:2005 05 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,242 $0 Not Implemented
UM0290 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,296 $1,950 Implemented
UM0276 # 01 Y:2005 01 2005 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $206,100 $96,000 Implemented
UM0276 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $663,486 $7,500,000 Not Implemented
UM0276 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,572 $2,500 Implemented
UM0275 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,025 $1,800 Implemented
UM0275 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,898 $500 Implemented
UM0275 # 08 Y:2005 08 2005 AIR CONDITION ONLY SPACE NECESSARY $4,727 $50 Implemented
UM0275 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,883 $3,000 Implemented
UM0275 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $7,113 $5,492 Not Implemented
UM0275 # 02 Y:2005 02 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,025 $12,250 Not Implemented
UM0275 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,372 $25,936 Not Implemented
UM0275 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $193,508 $1,140,000 Not Implemented