IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0160 # 06 Y:2000 06 2000 $1,600 $300 Not Implemented
UM0160 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $7,300 $500 Implemented
UM0160 # 04 Y:2000 04 2000 AIR CONDITION ONLY SPACE NECESSARY $2,800 $220 Implemented
UM0160 # 03 Y:2000 03 2000 USE POWER DURING OFF-PEAK PERIODS $55,632 $22,000 Implemented
UM0160 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,149 $200 Implemented
UM0160 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $50 Implemented
UM0158 # 04 Y:2000 04 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $11,891 $9,860 Not Implemented
UM0158 # 07 Y:2000 07 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $364,003 $3,000,000 Not Implemented
UM0158 # 06 Y:2000 06 2000 REDUCE FLUID FLOW RATES $40,377 $1,000 Not Implemented
UM0158 # 05 Y:2000 05 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $106,009 $100,000 Not Implemented
UM0158 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $138,702 $86,970 Implemented
UM0158 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,190 $1,400 Not Implemented
UM0158 # 01 Y:2000 01 2000 REPAIR OR REPLACE STEAM TRAPS $67,296 $2,200 Implemented
UM0156 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $1,786 $0 Implemented
UM0156 # 08 Y:2000 08 2000 $38,942 $20,000 Not Implemented
UM0156 # 07 Y:2000 07 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $19,310 $7,000 Not Implemented
UM0156 # 06 Y:2000 06 2000 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,640 $6,500 Implemented
UM0156 # 05 Y:2000 05 2000 REPAIR OR REPLACE STEAM TRAPS $9,420 $880 Implemented
UM0156 # 04 Y:2000 04 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $1,813 $4,430 Not Implemented
UM0156 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,860 $48,600 Not Implemented
UM0156 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $428 $500 Implemented
UM0155 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $575 $500 Implemented
UM0155 # 04 Y:2000 04 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,751 $18,000 Not Implemented
UM0155 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $664 $309 Implemented
UM0155 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,279 $300 Implemented