Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
407
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0428 # 04 Y:2013 | 04 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $636 | $1,200 | Implemented |
UM0428 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,177 | $9,000 | Implemented |
UM0425 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,480 | $3,300 | Implemented |
UM0425 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,115 | $0 | Implemented |
UM0425 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,752 | $5,000 | Implemented |
UM0425 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $695 | $308 | Implemented |
UM0424 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,312 | $750 | Implemented |
UM0424 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,204 | $1,000 | Implemented |
UM0424 # 05 Y:2013 | 05 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,695 | $1,600 | Implemented |
UM0422 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,633 | $500 | Implemented |
UM0422 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,593 | $14,120 | Implemented |
UM0415 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $822 | $875 | Implemented |
UM0415 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,600 | $1,000 | Implemented |
UM0413 # 01 Y:2012 | 01 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,930 | $1,000 | Implemented |
UM0413 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,508 | $2,500 | Implemented |
UM0408 # 02 Y:2012 | 02 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,324 | $2,000 | Implemented |
UM0408 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,021 | $1,500 | Implemented |
UM0408 # 05 Y:2012 | 05 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $595 | $100 | Implemented |
UM0408 # 06 Y:2012 | 06 | 2012 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $1,364 | $0 | Implemented |
UM0408 # 07 Y:2012 | 07 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,129 | $1,000 | Implemented |
UM0407 # 02 Y:2012 | 02 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,427 | $2,000 | Implemented |
UM0407 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $6,006 | $8,000 | Implemented |
UM0407 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,660 | $1,500 | Implemented |
UM0407 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $480 | $100 | Implemented |
UM0407 # 09 Y:2012 | 09 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,121 | $1,000 | Implemented |