IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0369 # 05 Y:2010 05 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,318 $21,700 Implemented
UM0369 # 06 Y:2010 06 2010 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,181 $2,254 Implemented
UM0369 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,164 $1,000 Implemented
UM0369 # 10 Y:2010 10 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,010 $1,300 Implemented
UM0366 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $2,117 $596 Implemented
UM0366 # 05 Y:2010 05 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $85 $31 Implemented
UM0363 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,083 $500 Implemented
UM0363 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,498 $10,000 Implemented
UM0363 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,241 $1,000 Implemented
UM0363 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $2,173 $1,375 Implemented
UM0363 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $542 $1,568 Implemented
UM0358 # 01 Y:2009 01 2009 ISOLATE HOT OR COLD EQUIPMENT $21,998 $720 Implemented
UM0358 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,988 $23,603 Implemented
UM0358 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $69 $62 Implemented
UM0358 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,552 $36,000 Implemented
UM0358 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $5,125 $11,770 Implemented
UM0357 # 01 Y:2009 01 2009 INSTALL STORM WINDOWS AND DOORS $88,261 $361,980 Implemented
UM0357 # 02 Y:2009 02 2009 USE RADIANT HEATER FOR SPOT HEATING $48,733 $25,000 Implemented
UM0357 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,053 $42,818 Implemented
UM0357 # 04 Y:2009 04 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,524 $2,591 Implemented
UM0357 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,523 $1,359 Implemented
UM0357 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $1,466 $4,692 Implemented
UM0357 # 07 Y:2009 07 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,875 $7,500 Implemented
IC0147 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,453 $75,348 Implemented
IC0147 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,889 $55,200 Implemented