IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0147 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,712 $2,967 Implemented
IC0147 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $4,311 $4,750 Implemented
IC0147 # 05 Y:2008 05 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $395 $250 Implemented
IC0147 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,605 $0 Implemented
IC0147 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $133 $398 Implemented
IC0147 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,952 $15,562 Implemented
IC0147 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $200 $246 Implemented
IC0147 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,527 $30,225 Implemented
IC0147 # 11 Y:2008 11 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,598 $9,911 Implemented
IC0147 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,138 $1,380 Implemented
IC0147 # 13 Y:2008 13 2008 UPGRADE OBSOLETE EQUIPMENT $17,075 $5,520 Implemented
IC0147 # 14 Y:2008 14 2008 RECOVER WASTE HEAT FROM EQUIPMENT $13,784 $8,670 Implemented
IC0147 # 15 Y:2008 15 2008 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $5,100 $0 Implemented
UM0333 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,901 $2,000 Implemented
UM0333 # 03 Y:2007 03 2007 REDUCE VENTILATION AIR $8,623 $100 Implemented
UM0333 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,589 $3,480 Implemented
UM0333 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,455 $100 Implemented
UM0328 # 10 Y:2007 10 2007 INSULATE BARE EQUIPMENT $1,625 $1,238 Implemented
UM0328 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,110 $1,000 Implemented
UM0323 # 13 Y:2007 13 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $206 Implemented
UM0323 # 12 Y:2007 12 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $75 Implemented
UM0323 # 11 Y:2007 11 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $946 $1,000 Implemented
UM0323 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,122 $1,000 Implemented
UM0323 # 09 Y:2007 09 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,628 $4,248 Implemented
UM0323 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,157 $1,836 Implemented