IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0170 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $185,532 $310,000 Not Implemented
UM0170 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,147 $500 Implemented
UM0170 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $709 $1,660 Implemented
UM0170 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $64,245 $22,000 Not Implemented
UM0170 # 05 Y:2000 05 2000 $11,573 $8,200 Not Implemented
ND0356 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,224 $853 Implemented
ND0356 # 09 Y:2000 09 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $658 $200 Implemented
ND0356 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $527 $600 Not Implemented
ND0356 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,843 $8,685 Not Implemented
ND0356 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $353 $300 Not Implemented
ND0356 # 05 Y:2000 05 2000 DEVELOP A REPAIR/REPLACE POLICY $584 $2,012 Not Implemented
ND0356 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $309 $40 Implemented
ND0356 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $419 $400 Implemented
ND0356 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $220 Implemented
UM0167 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,700 $4,550 Not Implemented
UM0167 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,167 $500 Not Implemented
UM0167 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,504 $825 Not Implemented
UM0167 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,795 $100 Not Implemented
UM0167 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,108 $4,665 Not Implemented
UM0167 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $6,118 $3,300 Not Implemented
UM0167 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $16,497 $1,000 Not Implemented
UM0167 # 08 Y:2000 08 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $7,288 $11,000 Not Implemented
UM0166 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $244 $400 Not Implemented
UM0166 # 03 Y:2000 03 2000 USE RADIANT HEATER FOR SPOT HEATING $2,815 $10,000 Not Implemented
UM0166 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,705 $5,925 Implemented