Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
239
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0176 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $733 | $500 | Not Implemented |
UM0176 # 04 Y:2000 | 04 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $127,531 | $162,750 | Not Implemented |
UM0176 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $425,187 | $800,000 | Not Implemented |
UM0176 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,038 | $2,201 | Not Implemented |
UM0176 # 02 Y:2000 | 02 | 2000 | INCREASE AMOUNT OF CONDENSATE RETURNED | $72,582 | $15,000 | Not Implemented |
UM0176 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $51,717 | $8,050 | Not Implemented |
UM0175 # 06 Y:2000 | 06 | 2000 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $9,120 | $7,313 | Not Implemented |
UM0175 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,249 | $600 | Implemented |
UM0175 # 05 Y:2000 | 05 | 2000 | USE OPTIMUM THICKNESS INSULATION | $3,029 | $1,324 | Not Implemented |
UM0175 # 03 Y:2000 | 03 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,332 | $6,000 | Not Implemented |
UM0175 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $1,824 | $2,288 | Not Implemented |
UM0175 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $455 | $1,000 | Not Implemented |
UM0174 # 07 Y:2000 | 07 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $7,800 | $2,000 | Implemented |
UM0174 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,906 | $1,200 | Implemented |
UM0174 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $530 | $350 | Implemented |
UM0174 # 06 Y:2000 | 06 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $5,080 | $25,000 | Not Implemented |
UM0174 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,038 | $500 | Implemented |
UM0174 # 01 Y:2000 | 01 | 2000 | INSULATE BARE EQUIPMENT | $4,136 | $3,600 | Not Implemented |
UM0174 # 02 Y:2000 | 02 | 2000 | USE OPTIMUM THICKNESS INSULATION | $5,460 | $490 | Not Implemented |
UM0173 # 03 Y:2000 | 03 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $758 | $700 | Not Implemented |
UM0173 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,300 | $750 | Not Implemented |
UM0173 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $3,506 | $800 | Not Implemented |
UM0173 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $225 | Not Implemented |
UM0173 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $573 | $800 | Not Implemented |
ND0363 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,260 | $520 | Implemented |