Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
130
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0221 # 01 Y:2002 | 01 | 2002 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $40,400 | $4,000 | Implemented |
UM0221 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,486 | $7,425 | Implemented |
UM0221 # 05 Y:2002 | 05 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,750 | $12,870 | Not Implemented |
UM0221 # 10 Y:2002 | 10 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,125 | $2,000 | Not Implemented |
UM0221 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,720 | $2,000 | Not Implemented |
UM0221 # 08 Y:2002 | 08 | 2002 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,075 | $3,000 | Not Implemented |
UM0221 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,700 | $1,250 | Implemented |
UM0221 # 09 Y:2002 | 09 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,340 | $8,500 | Not Implemented |
UM0221 # 07 Y:2002 | 07 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,650 | $2,000 | Not Implemented |
UM0221 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,580 | $42,883 | Not Implemented |
UM0220 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,947 | $2,064 | Not Implemented |
UM0220 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $973 | $1,700 | Implemented |
UM0220 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,258 | $25,000 | Not Implemented |
UM0220 # 02 Y:2002 | 02 | 2002 | MAINTAIN MACHINES TO REDUCE LEAKS | $7,380 | $1,150 | Implemented |
UM0220 # 07 Y:2002 | 07 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,690 | $10,000 | Not Implemented |
UM0220 # 05 Y:2002 | 05 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $4,385 | $800 | Not Implemented |
UM0220 # 06 Y:2002 | 06 | 2002 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,928 | $2,400 | Not Implemented |
UM0219 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,965 | $62,826 | Implemented |
UM0219 # 07 Y:2002 | 07 | 2002 | RECOVER AND REUSE COOLING WATER | $8,640 | $5,940 | Implemented |
UM0219 # 06 Y:2002 | 06 | 2002 | REPLACE BOILER | $3,920 | $12,000 | Implemented |
UM0219 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $78,674 | $26,400 | n/a |
UM0219 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $431 | $600 | Not Implemented |
UM0219 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $283 | $225 | Implemented |
UM0219 # 05 Y:2002 | 05 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,258 | $800 | Implemented |
UM0218 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,191 | $200 | Implemented |