IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0244 # 01 Y:2003 01 2003 ADOPT IN-HOUSE MATERIAL GENERATION $101,745 $30,000 Not Implemented
UM0244 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,023 $521 Implemented
UM0244 # 03 Y:2003 03 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $582 $2,477 Not Implemented
UM0244 # 04 Y:2003 04 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,499 $51,860 Not Implemented
UM0244 # 02 Y:2003 02 2003 SIZE TRUCKS TO JOB $76,800 $54,000 Implemented
UM0244 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,221 Not Implemented
UM0243 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,928 $520 Implemented
UM0243 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,857 $150 Implemented
UM0243 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $20,715 $4,565 Not Implemented
UM0243 # 04 Y:2003 04 2003 AIR CONDITION ONLY SPACE NECESSARY $13,955 $6,000 Implemented
UM0243 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,082 $100 Not Implemented
UM0243 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $142,452 $31,500 Implemented
UM0242 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $9,740 $6,270 Not Implemented
UM0242 # 04 Y:2003 04 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,040 $1,100 Not Implemented
UM0242 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,670 $300 Not Implemented
UM0242 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $2,170 Not Implemented
UM0242 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,195 $1,000 Not Implemented
UM0242 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $4,180 $645 Not Implemented
UM0241 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $75 Implemented
UM0241 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $10,510 Implemented
UM0241 # 01 Y:2003 01 2003 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $573,000 $390,000 Not Implemented
UM0241 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,275 $2,100 Implemented
UM0241 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,350 $8,000 Implemented
UM0241 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,900 $4,800 Not Implemented
UM0239 # 06 Y:2003 06 2003 COVER OPEN TANKS $7,400 $3,290 Not Implemented