IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0132 # 14 Y:2013 14 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $865 $635 Implemented
MZ0132 # 13 Y:2013 13 2013 INSTALL OCCUPANCY SENSORS $1,565 $640 Implemented
MZ0132 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,603 $3,100 Implemented
MZ0132 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $4,877 $2,600 Implemented
MZ0132 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,108 $1,630 Implemented
MZ0112 # 05 Y:2013 05 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $48,000 $2,270 Implemented
MZ0112 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
MZ0112 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $6,417 $3,000 Implemented
MZ0112 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,576 $14,260 Implemented
MZ0092 # 01 Y:2012 01 2012 REPAIR OR REPLACE STEAM TRAPS $14,965 $4,500 Implemented
MZ0092 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,516 $263 Implemented
MZ0092 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $6,999 $3,738 Implemented
MZ0092 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,594 $1,000 Implemented
MZ0092 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $567 $140 Implemented
MZ0061 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $79 $1,200 Implemented
MZ0061 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,994 $5,000 Implemented
MZ0061 # 08 Y:2010 08 2010 REDUCE SCRAP PRODUCTION $92,766 $100,000 Implemented
MZ0061 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,160 $3,680 Implemented
MZ0061 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,184 $0 Implemented
MZ0061 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,019 $0 Implemented
MZ0061 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,947 $2,160 Implemented
MZ0061 # 01 Y:2010 01 2010 USE OPTIMUM THICKNESS INSULATION $145 $300 Implemented
MZ0060 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $32,699 $5,400 Implemented
IA0351 # 07 Y:2004 07 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,639 $300 Implemented
IA0351 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $692 $1,554 Implemented