IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0073 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,750 $0 Implemented
MZ0073 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $0 Implemented
MZ0068 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,373 $1,770 Implemented
MZ0068 # 02 Y:2011 02 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $229 $660 Implemented
MZ0068 # 07 Y:2011 07 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $31 $0 Implemented
MZ0068 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $333 $0 Implemented
MZ0068 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $2,110 Implemented
MZ0068 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12 $60 Implemented
MZ0069 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $630 $250 Implemented
MZ0069 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $87 $0 Implemented
MZ0069 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,586 $820 Implemented
MZ0069 # 15 Y:2011 15 2011 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $115,000 $125,000 Implemented
MZ0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $2,600 Implemented
MZ0069 # 07 Y:2011 07 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $36,400 $0 Implemented
MZ0050 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $15,507 $0 Implemented
MZ0050 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $585 $6,000 Implemented
MZ0050 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $24,897 $5,000 Implemented
MZ0050 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,616 $0 Implemented
MZ0039 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,863 $0 Implemented
MZ0039 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $850 Implemented
MZ0039 # 05 Y:2009 05 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $15,679 $18,600 Implemented
MZ0039 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,883 $510,446 Implemented
MZ0039 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,294 $8,400 Implemented
BD0313 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,038 $10,039 Implemented
BD0313 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $800 Implemented