IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0113 # 07 Y:2013 07 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,948 $50 Implemented
MZ0113 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,620 $900 Implemented
MZ0113 # 09 Y:2013 09 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $545 $902 Implemented
MZ0113 # 10 Y:2013 10 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $620 Implemented
MZ0113 # 11 Y:2013 11 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $488 $1,050 Implemented
MZ0097 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $230,479 $107,601 Not Implemented
MZ0097 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $106,168 $10,690 Not Implemented
MZ0097 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $60,715 $105,000 Not Implemented
MZ0097 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $49,961 $5,000 Not Implemented
MZ0097 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,305 $35,000 Implemented
MZ0097 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,968 $450 Implemented
MZ0097 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,420 $2,000 Not Implemented
MZ0088 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $532 $800 Not Implemented
MZ0088 # 02 Y:2012 02 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,179 $11,250 Not Implemented
MZ0088 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,833 $0 Not Implemented
MZ0088 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,252 $2,400 Not Implemented
MZ0088 # 05 Y:2012 05 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $698 $1,200 Not Implemented
MZ0067 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,468 $17,620 Not Implemented
MZ0067 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,071 $26,900 Not Implemented
MZ0067 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $672 $230 Not Implemented
MZ0067 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,702 $850 Not Implemented
MZ0067 # 05 Y:2011 05 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,674 $0 Not Implemented
MZ0067 # 06 Y:2011 06 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,200 $2,200 Not Implemented
MZ0077 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $6,493 $1,100 Not Implemented
MZ0077 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $317 $110 Not Implemented