Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0088 # 01 Y:2016 | 01 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,541 | $11,782 | Not Implemented |
BS0088 # 02 Y:2016 | 02 | 2016 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $64,374 | $480 | Not Implemented |
BS0088 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,994 | $29,692 | Not Implemented |
BS0087 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,907 | $27,896 | Not Implemented |
BS0087 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,873 | $275 | Not Implemented |
BS0087 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $689 | $5,040 | Not Implemented |
BS0087 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $32,576 | $43,711 | Not Implemented |
CO0730 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,620 | $11,750 | n/a |
CO0730 # 03 Y:2016 | 03 | 2016 | COVER OPEN TANKS | $7,390 | $12,880 | n/a |
CO0730 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,690 | $20,770 | n/a |
CO0730 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,590 | $1,680 | n/a |
CO0729 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,100 | $6,040 | n/a |
CO0729 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,510 | $51,780 | n/a |
CO0729 # 02 Y:2016 | 02 | 2016 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $25,340 | $123,200 | n/a |
CO0729 # 01 Y:2016 | 01 | 2016 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $70,080 | $60,480 | n/a |
CO0728 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,300 | $34,570 | n/a |
CO0728 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,350 | $1,240 | n/a |
CO0728 # 01 Y:2016 | 01 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,840 | $6,000 | n/a |
CO0726 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $680 | $1,630 | n/a |
CO0726 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $380 | $660 | n/a |
CO0726 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,470 | $36,440 | n/a |
CO0726 # 04 Y:2016 | 04 | 2016 | BURN WASTE OIL FOR HEAT | $5,380 | $5,270 | n/a |
CO0725 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,690 | $100 | n/a |
CO0725 # 06 Y:2016 | 06 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,050 | $2,950 | n/a |
CO0725 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,040 | $13,050 | n/a |