IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0574 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $138,968 $500 Implemented
NC0539 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $357 $100 Implemented
NC0539 # 06 Y:2015 06 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,216 $2,500 Implemented
NC0539 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,453 $500 Not Implemented
NC0539 # 03 Y:2015 03 2015 DEVELOP A REPAIR/REPLACE POLICY $2,085 $4,526 Implemented
NC0539 # 01 Y:2015 01 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $6,900 $3,517 Implemented
NC0539 # 02 Y:2015 02 2015 KEEP BOILER TUBES CLEAN $3,889 $2,000 Implemented
NC0539 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,189 $3,822 Not Implemented
NC0539 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $53 $200 Not Implemented
NC0479 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,261 $100 Implemented
NC0479 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,601 $10,000 Implemented
NC0479 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $238 $1,102 Implemented
NC0479 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,663 $40,000 Not Implemented
NC0479 # 09 Y:2013 09 2013 INSULATE BARE EQUIPMENT $533 $350 Implemented
NC0479 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99 $351 Implemented
NC0479 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $106 $250 Implemented
NC0479 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,378 $3,750 Not Implemented
NC0479 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,059 $2,867 Not Implemented
NC0470 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $883 $1,575 Implemented
NC0470 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,181 $151,669 Implemented
NC0470 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,234 $33,182 Not Implemented
NC0470 # 07 Y:2012 07 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $12,321 $36,400 Not Implemented
NC0470 # 01 Y:2012 01 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $1,179 $0 Implemented
NC0470 # 02 Y:2012 02 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,916 $18,000 Not Implemented
NC0470 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $671 $1,100 Implemented