IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

747

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0460 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $6,426 $7,515 Not Implemented
NC0460 # 12 Y:2012 12 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $897 $1,290 Not Implemented
NC0460 # 13 Y:2012 13 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $11 Not Implemented
NC0440 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157,713 $165,618 Implemented
NC0440 # 02 Y:2011 02 2011 DEVELOP A REPAIR/REPLACE POLICY $15,127 $20,158 Implemented
NC0440 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,350 $800 Not Implemented
NC0440 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $500 Implemented
NC0440 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,312 $8,420 Implemented
NC0424 # 01 Y:2011 01 2011 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $51,507 $142,273 Not Implemented
NC0424 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,681 $112,768 Implemented
NC0424 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,430 $4,435 Implemented
NC0424 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,685 $78,795 Implemented
NC0424 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,791 $100 Implemented
NC0424 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $27,638 $74,990 Not Implemented
NC0407 # 01 Y:2010 01 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,128 $60,000 Implemented
NC0407 # 02 Y:2010 02 2010 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $35,567 $200,000 Not Implemented
NC0407 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,606 $1,000 Implemented
NC0407 # 04 Y:2010 04 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,147 $42,000 Implemented
NC0407 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $350 $50 Not Implemented
NC0407 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $6,897 Implemented
NC0357 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,234 $78,000 Not Implemented
NC0357 # 02 Y:2007 02 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $16,558 $5,600 Not Implemented
NC0357 # 03 Y:2007 03 2007 DEVELOP A REPAIR/REPLACE POLICY $699 $375 Not Implemented
NC0357 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,527 $4,761 Not Implemented
NC0357 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $277 $100 Implemented