IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0308 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,359 $20,313 Implemented
NC0308 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,017 $2,450 Implemented
NC0308 # 07 Y:2005 07 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $867 $750 Implemented
NC0308 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,493 $2,000 Implemented
NC0275 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $455 $683 Implemented
NC0275 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,207 $4,563 Implemented
NC0266 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $61 $132 Implemented
NC0266 # 02 Y:2003 02 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,628 $4,597 Implemented
NC0266 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,941 $2,157 Implemented
NC0266 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $1,456 Implemented
NC0266 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $300 Implemented
NC0266 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,833 $1,189 Implemented
NC0248 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $196 $334 Implemented
NC0248 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $982 $1,936 Implemented
NC0248 # 05 Y:2002 05 2002 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,743 $40,000 Implemented
NC0248 # 04 Y:2002 04 2002 DEVELOP A REPAIR/REPLACE POLICY $2,115 $1,075 Implemented
NC0248 # 03 Y:2002 03 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $8,379 $7,882 Implemented
NC0232 # 01 Y:2002 01 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $13,002 $800 Implemented
NC0232 # 03 Y:2002 03 2002 DEVELOP A REPAIR/REPLACE POLICY $1,645 $1,818 Implemented
NC0232 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $561 $248 Implemented
NC0232 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $150 Implemented
NC0232 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,486 $850 Implemented
NC0106 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,634 $1,200 Implemented
NC0106 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $21,825 $35,000 Implemented
NC0106 # 07 Y:1997 07 1997 USE PHOTOCELL CONTROLS $113 $90 Implemented