IAC logo
IAC Assessment: NC0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1997
Principal Product paper for liquid packaging
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $50,000,000-$100,000,000
# of Employees 255
Plant Area (Sq.Ft.) 165,000
Annual Production 50,000 Tons
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $600,559 18,680,246 kWh $0.03
Electricity Demand $336,046 35,655 kW-months/year $9.42
Electricity Fees $45,041 - $ -
Natural Gas $161,160 49,897 MMBtu $3.23
TOTAL ENERGY COSTS $1,355,806
RECOMMENDED SAVINGS* $2,842,608 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,648,432
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ %
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,580,000
Cost:
$750,000
- - - - - - - - - - - - $2,580,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$2,580,000
-
%
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,860
Cost:
$1,488
$1,330 41,032 $530 59 - - - - - - - - - - $1,330
41,032
kWh
$530
59
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,304
Cost:
$770
$3,078 94,666 $1,226 135 - - - - - - - - - - $3,078
94,666
kWh
$1,226
135
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,634
Cost:
$1,200
- - - - - - $6,634 2,054 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,634
2,054
MMBtu
-
-
lb
-
-
$
-
-
%
05: 2.7314 REDUCE VENTILATION AIR Savings:
$21,825
Cost:
$35,000
$1,400 43,083 $1,940 214 - - $18,485 5,723 - - - - - - $1,400
43,083
kWh
$1,940
214
kW-months/year
-
-
$
$18,485
5,723
MMBtu
-
-
lb
-
-
$
-
-
%
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,895
Cost:
-
- - - - $1,895 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,895
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$113
Cost:
$90
$64 2,052 $49 5 - - - - - - - - - - $64
2,052
kWh
$49
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$507
Cost:
$1,530
$190 5,862 $317 35 - - - - - - - - - - $190
5,862
kWh
$317
35
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$193
Cost:
$840
$96 2,931 $37 4 - - - - - - $60 - - - $96
2,931
kWh
$37
4
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$60
-
$
-
-
%
10: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$187,277
Cost:
-
$22,277 685,522 - - - - - - $165,000 300,000 - - - - $22,277
685,522
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$165,000
300,000
lb
-
-
$
-
-
%
11: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$38,000
Cost:
-
- - - - - - - - $48,000 200,000 $(-10,000) - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$48,000
200,000
lb
$(-10,000)
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$2,842,608
Cost:
$790,918
$28,435 875,148 $4,099 452 $1,895 - $25,119 7,777 $213,000 500,000 $(-9,940) - $2,580,000 - $28,435
875,148
kWh
$4,099
452
kW-months/year
$1,895
-
$
$25,119
7,777
MMBtu
$213,000
500,000
lb
$(-9,940)
-
$
$2,580,000
-
%
TOTAL IMPLEMENTED Savings:
$2,648,432
Cost:
$787,778
$2,794 86,167 $2,519 278 - - $25,119 7,777 $48,000 200,000 $(-10,000) - $2,580,000 - $2,794
86,167
kWh
$2,519
278
kW-months/year
-
-
$
$25,119
7,777
MMBtu
$48,000
200,000
lb
$(-10,000)
-
$
$2,580,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production