IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0147 # 07 Y:1998 07 1998 ADD ADDITIONAL PRODUCTION SHIFT $100,000 $1,000 Not Implemented
NC0147 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,282 $200 Implemented
NC0147 # 03 Y:1998 03 1998 USE OPTIMUM THICKNESS INSULATION $723 $675 Not Implemented
NC0147 # 06 Y:1998 06 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $14,809 $0 Implemented
NC0147 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,356 $4,000 Implemented
NC0147 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $375 $200 Implemented
NC0147 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $610 $500 Implemented
NC0152 # 03 Y:1998 03 1998 COVER OPEN TANKS $1,006 $100 Implemented
NC0152 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,160 $0 Implemented
NC0152 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $396 $80 Not Implemented
NC0152 # 08 Y:1998 08 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,777 $4,000 Not Implemented
NC0152 # 02 Y:1998 02 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,988 $13,000 Not Implemented
NC0152 # 09 Y:1998 09 1998 EXPAND OPERATIONS INTO UNUSED SPACE $31,250 $12,850 Not Implemented
NC0152 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $563 $200 Implemented
NC0152 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $4,388 $1,000 Not Implemented
NC0152 # 06 Y:1998 06 1998 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,010 $5,000 Not Implemented
NC0154 # 04 Y:1998 04 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,693 $5,000 n/a
NC0154 # 06 Y:1998 06 1998 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,876 $1,500 n/a
NC0154 # 02 Y:1998 02 1998 CLOSE OFF UNNEEDED STEAM LINES $2,893 $3,000 n/a
NC0154 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $520,000 $0 n/a
NC0154 # 03 Y:1998 03 1998 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,295 $825 n/a
NC0154 # 07 Y:1998 07 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $62,900 $5,500 n/a
NC0154 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,140 $0 n/a
NC0154 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,913 $15,000 n/a
NC0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $556 $60 Implemented