Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
208
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0147 # 07 Y:1998 | 07 | 1998 | ADD ADDITIONAL PRODUCTION SHIFT | $100,000 | $1,000 | Not Implemented |
NC0147 # 01 Y:1998 | 01 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,282 | $200 | Implemented |
NC0147 # 03 Y:1998 | 03 | 1998 | USE OPTIMUM THICKNESS INSULATION | $723 | $675 | Not Implemented |
NC0147 # 06 Y:1998 | 06 | 1998 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $14,809 | $0 | Implemented |
NC0147 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,356 | $4,000 | Implemented |
NC0147 # 05 Y:1998 | 05 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $375 | $200 | Implemented |
NC0147 # 02 Y:1998 | 02 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $610 | $500 | Implemented |
NC0152 # 03 Y:1998 | 03 | 1998 | COVER OPEN TANKS | $1,006 | $100 | Implemented |
NC0152 # 05 Y:1998 | 05 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,160 | $0 | Implemented |
NC0152 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $396 | $80 | Not Implemented |
NC0152 # 08 Y:1998 | 08 | 1998 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $16,777 | $4,000 | Not Implemented |
NC0152 # 02 Y:1998 | 02 | 1998 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,988 | $13,000 | Not Implemented |
NC0152 # 09 Y:1998 | 09 | 1998 | EXPAND OPERATIONS INTO UNUSED SPACE | $31,250 | $12,850 | Not Implemented |
NC0152 # 07 Y:1998 | 07 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $563 | $200 | Implemented |
NC0152 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,388 | $1,000 | Not Implemented |
NC0152 # 06 Y:1998 | 06 | 1998 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $3,010 | $5,000 | Not Implemented |
NC0154 # 04 Y:1998 | 04 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,693 | $5,000 | n/a |
NC0154 # 06 Y:1998 | 06 | 1998 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,876 | $1,500 | n/a |
NC0154 # 02 Y:1998 | 02 | 1998 | CLOSE OFF UNNEEDED STEAM LINES | $2,893 | $3,000 | n/a |
NC0154 # 08 Y:1998 | 08 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $520,000 | $0 | n/a |
NC0154 # 03 Y:1998 | 03 | 1998 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,295 | $825 | n/a |
NC0154 # 07 Y:1998 | 07 | 1998 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $62,900 | $5,500 | n/a |
NC0154 # 05 Y:1998 | 05 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,140 | $0 | n/a |
NC0154 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,913 | $15,000 | n/a |
NC0141 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $556 | $60 | Implemented |